In the forum post, the OP asks for feedback on his SharePoint 2007 DR strategy:
- The farm consists of two physical DB servers and two physical Web servers. One physical Web server is virtualised meaning there are 3 Web servers in total. Note that it is assumed that these servers also host the query and index role.
- There is a very limited budget (as is often the case) in that only one server has been approved for DR purposes.
- No availability (e.g. uptime %) requirements are specified.
- No capacity (e.g. number of users, RPS) requirements are specified.
- The OP plans to implement a "stretched farm" over a WAN link. We can assume here that they are not closely linked as it is stated that that backup server is "in another part of the world". The DR server would be added to the farm as a Web server, and other roles would be added if required.
However, I did think of a few potential issues with the OPs suggestion:
- Stretched farms are only a realistic scenario where they are in close proximity with high speed links. That means less then 1ms latency and 1GB/s bandwidth.
- The SharePoint configuration and central administration content databases contain computer-specific information meaning that the restoration environment must contain the same topology and server roles - which would not be possible on a single server.
- There is no mention of the other SharePoint infrastructure requirements, including DNS and a user directory, although we will assume for this scenario that the OP has included those services as part of their DR strategy anyway.
- Aggregate capacity requirements need to be met on the single DR server for the duration of the servers use. This means whatever resources were used on the "live" farm servers need to be available on the standby. Amongst others this includes CPU cycles, RAM, disk capacity, disk IO requirements, and network bandwidth.

From these observations I concluded that:
- A separate standby farm is required - as we only have one server available this will be a standalone server with all roles on one box.
- The standby server needs to meet the aggregate capacity requirements provided by the existing servers for the duration of the outage.
- Create a separate DR farm and apply all Windows, SQL, WSS and MOSS updates to match that of the live environment as closely as possible.
- Deploy all SharePoint customisations to the DR farm
- Create and configure all Web applications to the DR farm, restoring all content databases from the live farm.
- Test it!
Of course, this is just one possible approach. If you have any suggestions or improvements I'd like to hear them!